Lift maintenance: Compliance Inspection Calendar

The Compliance Inspection Calendar carries 11 published figures read from 3 sources' own pages, from 10 to 180 day, read 17 October 2026.

Upkeepvo sells its own paid plan in this category (our pricing). It is not counted here: every figure in this index is another provider's own published price, read from its own page.

10 to 180 day Range of the published figures 11 published figures, not one market: read the rows
3 Sources with a figure of 12 read in full, 18 Oct 2026
3 of 12 Sources read that publish one 25% publish a figure at all
  1. EPA stationary refrigeration leak repair requirements180 day
  2. EPA stationary refrigeration leak repair requirements120 day
  3. EPA stationary refrigeration leak repair requirements120 day
  4. eCFR 49 CFR 396.3 inspection, repair and maintenance90 day
  5. EPA stationary refrigeration leak repair requirements30 day
  6. EPA stationary refrigeration leak repair requirements30 day
  7. EPA stationary refrigeration leak repair requirements30 day
  8. eCFR 40 CFR 82.157 appliance maintenance and leak repair30 day
  9. eCFR 40 CFR 82.157 appliance maintenance and leak repair30 day
  10. eCFR 40 CFR 82.157 appliance maintenance and leak repair30 day
  11. eCFR 40 CFR 82.157 appliance maintenance and leak repair10 day
One figure per source, highest first; the top 12 of 14.
Table view
RowValue
EPA stationary refrigeration leak repair requirements180 day
EPA stationary refrigeration leak repair requirements120 day
EPA stationary refrigeration leak repair requirements120 day
eCFR 49 CFR 396.3 inspection, repair and maintenance90 day
EPA stationary refrigeration leak repair requirements30 day
EPA stationary refrigeration leak repair requirements30 day
EPA stationary refrigeration leak repair requirements30 day
eCFR 40 CFR 82.157 appliance maintenance and leak repair30 day
eCFR 40 CFR 82.157 appliance maintenance and leak repair30 day
eCFR 40 CFR 82.157 appliance maintenance and leak repair30 day
eCFR 40 CFR 82.157 appliance maintenance and leak repair10 day
  1. 630 to 40
  2. 40 to 50
  3. 50 to 60
  4. 60 to 70
  5. 70 to 80
  6. 180 to 90
Where the 11 published figures fall, day, in six equal bands from the lowest to the highest.
Bands
BucketValue
30 to 406 sources
40 to 500 sources
50 to 600 sources
60 to 700 sources
70 to 800 sources
80 to 901 source

3 of the 12 named sources read in full publish a figure; 9 publish none, read 17 October 2026.

Every figure, with its source

One row per source: the figure the source's own page publishes, the page, and the day it was read. A figure that is not on a page we read is not on this one.

The sentence each figure was read from (14)
  • EPA stationary refrigeration leak repair requirements, read 2026-09-26: Within 180 days of the failed follow-up verification test, the owners or operators determine the leak rate is below the trigger rate.
  • EPA stationary refrigeration leak repair requirements, read 2026-09-26: In cases where an industrial process shutdown is required, a repair period of 120 days is substituted for the normal 30-day repair period.
  • EPA stationary refrigeration leak repair requirements, read 2026-09-26: Additional time is permitted for conducting repairs on appliances where the necessary repair parts are unavailable or if other applicable federal, state, or local regulations make a repair within required timeline (e.g., 30 or 120 days) impossible.
  • eCFR 49 CFR 396.3 inspection, repair and maintenance, read 2026-10-17: (2) Pushout windows, emergency doors, and emergency door marking lights in buses shall be inspected at least every 90 days.
  • EPA stationary refrigeration leak repair requirements, read 2026-09-26: Repair leaks within 30 days from the date the leak was discovered, or
  • EPA stationary refrigeration leak repair requirements, read 2026-09-26: Develop, within 30 days, a plan to retrofit or retire the appliance and complete the actions under that plan within 1 year.
  • EPA stationary refrigeration leak repair requirements, read 2026-09-26: Owners or operators who choose to retrofit or retire appliances must develop a retrofit or retirement plan within 30 days of detecting a leak that exceeds the trigger rates.
  • EPA stationary refrigeration leak repair requirements, read 2026-09-26: EPA will permit one additional 12-month period if the appliance is custom-built and the supplier of the appliance or a critical component has quoted a delivery time of more than 30 weeks from when the order was placed (assuming the order was placed in a timely manner).
  • eCFR 40 CFR 82.157 appliance maintenance and leak repair, read 2026-09-26: Owners or operators must identify and repair leaks in accordance with this paragraph within 30 days (or 120 days if an industrial process shutdown is required) of when refrigerant is added to an appliance exceeding the applicable leak rate in paragraph (c) of this section.
  • eCFR 40 CFR 82.157 appliance maintenance and leak repair, read 2026-09-26: Unless granted additional time, an initial verification test must be performed within 30 days (or 120 days if an industrial process shutdown is required) of an appliance exceeding the applicable leak rate in paragraph (c) of this section.
  • eCFR 40 CFR 82.157 appliance maintenance and leak repair, read 2026-09-26: Owners or operators are permitted more than 30 days (or 120 days if an industrial process shutdown is required) to comply with paragraphs (d) and (e) of this section if they meet the requirements of (f)(1) through (4) of this section or the appliance is mothballed.
  • eCFR 40 CFR 82.157 appliance maintenance and leak repair, read 2026-09-26: This must be confirmed by the leak rate calculation performed upon the next refrigerant addition. The leaks will be presumed to be repaired if there is no further refrigerant addition for 12 months after the repair or if the leak inspections required under paragraph (g) do not find any leaks in the appliance.
  • eCFR 40 CFR 82.157 appliance maintenance and leak repair, read 2026-09-26: A follow-up verification test must be performed within 10 days of the successful initial verification test or 10 days of the appliance reaching normal operating characteristics and conditions (if the appliance or isolated component was evacuated for the repair(s)).
  • eCFR 49 CFR 396.3 inspection, repair and maintenance, read 2026-10-17: The records required by this section shall be retained where the vehicle is either housed or maintained for a period of 1 year and for 6 months after the motor vehicle leaves the motor carrier's control.

Read in full, publishes no figure

9 named sources were read in full on the dates shown and print no usable figure. They are counted, never filled in.

Methodology

Every row is a verbatim sentence read from the named source's own page through our fetch service on the date shown, hash-pinned to the stored read (the sha of the page's visible text; the raw page is mirrored to R2).

3 of the 12 named sources that could be read published a usable figure; 9 published none and are recorded as not published, never filled in; 1 could not be read (blocked, dead or unreachable) and count nowhere.

The headline figures (median, minimum, maximum, quartiles) are over ONE figure per source in day (a source's median where its page yielded several accepted sentences), so N counts sources, never sentences; 26 candidate sentence(s) were refused by a reviewer with the reason recorded.

The fuller derivation this dataset is chartered to grow into (not yet what the figures above are; they are each source's own published figure as read): one row per jurisdiction per asset per rule: the required frequency quoted verbatim with its citation and effective date, beside the maker's recommended interval for the same asset from the interval index - which is the comparison nobody publishes (where the law is looser than the manufacturer, and where it is stricter); changed-since, which is the news when a rule is amended

26 candidate sentences on these pages were refused by a reviewer; each refusal and its reason is recorded in the review ledger.

Sources (13)
Cite or embed this figure

Cite or embed this figure

The Compliance Inspection Calendar carries 11 published figures read from 3 sources' own pages, from 10 to 180 day, read 17 October 2026.

3 of the 12 named sources read in full publish a figure; 9 publish none, read 17 October 2026.

Cite as: "Upkeepvo Compliance Inspection Calendar", updated 2026-10-18, https://upkeepvo.com/datasets/compliance-inspection-calendar/.

Embed this figure (plain HTML, no scripts)

30 to 90 day

3 published figures, Compliance Inspection Calendar, across 3 sources, read 17 October 2026

Source: Upkeepvo Compliance Inspection Calendar

Download the CSV (14 rows, computed 2026-10-18)

Start Upkeepvo ProKeep the schedule, not the spreadsheet