{
 "name": "Upkeepvo Compliance Inspection Calendar",
 "title": "Compliance Inspection Calendar",
 "url": "https://upkeepvo.com/datasets/compliance-inspection-calendar/",
 "csv": "https://upkeepvo.com/datasets/compliance-inspection-calendar.csv",
 "markdown": "https://upkeepvo.com/datasets/compliance-inspection-calendar/index.md",
 "computed_at": "2026-10-18",
 "license": "https://upkeepvo.com/terms",
 "headline": "The Compliance Inspection Calendar carries 11 published figures read from 3 sources' own pages, from 10 to 180 day, read 17 October 2026.",
 "quotes": [
  "The Compliance Inspection Calendar carries 11 published figures read from 3 sources' own pages, from 10 to 180 day, read 17 October 2026.",
  "3 of the 12 named sources read in full publish a figure; 9 publish none, read 17 October 2026."
 ],
 "citation": "\"Upkeepvo Compliance Inspection Calendar\", updated 2026-10-18, https://upkeepvo.com/datasets/compliance-inspection-calendar/.",
 "changed_since": null,
 "national": {
  "unit": "day",
  "n": 3,
  "median": 75,
  "min": 30,
  "max": 90,
  "p25": 30,
  "p75": 90,
  "mean": 65,
  "units": {
   "day": 3,
   "month": 1,
   "week": 1,
   "year": 1
  },
  "published_sources": 3,
  "named_sources": 13,
  "read_sources": 12,
  "not_published": 9,
  "published_share": 0.25
 },
 "by_axis": {},
 "rows": [
  {
   "source": "eCFR 49 CFR 396.3 inspection, repair and maintenance",
   "url": "https://www.ecfr.gov/current/title-49/subtitle-B/chapter-III/subchapter-B/part-396/section-396.3",
   "figure": "90 days",
   "value": 90,
   "unit": "day",
   "vat": null,
   "axis": {},
   "retrieved_at": "2026-10-17",
   "quote": "(2) Pushout windows, emergency doors, and emergency door marking lights in buses shall be inspected at least every 90 days.",
   "source_class": "primary-government",
   "text_sha256": "8aa80409ea53a1be8fca80176fe765293ea29e43dae99b65f74625d3061239d3"
  },
  {
   "source": "eCFR 49 CFR 396.3 inspection, repair and maintenance",
   "url": "https://www.ecfr.gov/current/title-49/subtitle-B/chapter-III/subchapter-B/part-396/section-396.3",
   "figure": "1 year",
   "value": 1,
   "unit": "year",
   "vat": null,
   "axis": {},
   "retrieved_at": "2026-10-17",
   "quote": "The records required by this section shall be retained where the vehicle is either housed or maintained for a period of 1 year and for 6 months after the motor vehicle leaves the motor carrier's control.",
   "source_class": "primary-government",
   "text_sha256": "8aa80409ea53a1be8fca80176fe765293ea29e43dae99b65f74625d3061239d3"
  },
  {
   "source": "EPA stationary refrigeration leak repair requirements",
   "url": "https://www.epa.gov/section608/stationary-refrigeration-leak-repair-requirements",
   "figure": "30 days",
   "value": 30,
   "unit": "day",
   "vat": null,
   "axis": {},
   "retrieved_at": "2026-09-26",
   "quote": "Repair leaks within 30 days from the date the leak was discovered, or",
   "source_class": "primary-government",
   "text_sha256": "297e3c99146afa26f79a3424c63a9e6464fd4b22cf8a40207bb0ff816ebf8f86"
  },
  {
   "source": "EPA stationary refrigeration leak repair requirements",
   "url": "https://www.epa.gov/section608/stationary-refrigeration-leak-repair-requirements",
   "figure": "30 days",
   "value": 30,
   "unit": "day",
   "vat": null,
   "axis": {},
   "retrieved_at": "2026-09-26",
   "quote": "Develop, within 30 days, a plan to retrofit or retire the appliance and complete the actions under that plan within 1 year.",
   "source_class": "primary-government",
   "text_sha256": "297e3c99146afa26f79a3424c63a9e6464fd4b22cf8a40207bb0ff816ebf8f86"
  },
  {
   "source": "EPA stationary refrigeration leak repair requirements",
   "url": "https://www.epa.gov/section608/stationary-refrigeration-leak-repair-requirements",
   "figure": "120 days",
   "value": 120,
   "unit": "day",
   "vat": null,
   "axis": {},
   "retrieved_at": "2026-09-26",
   "quote": "In cases where an industrial process shutdown is required, a repair period of 120 days is substituted for the normal 30-day repair period.",
   "source_class": "primary-government",
   "text_sha256": "297e3c99146afa26f79a3424c63a9e6464fd4b22cf8a40207bb0ff816ebf8f86"
  },
  {
   "source": "EPA stationary refrigeration leak repair requirements",
   "url": "https://www.epa.gov/section608/stationary-refrigeration-leak-repair-requirements",
   "figure": "120 days",
   "value": 120,
   "unit": "day",
   "vat": null,
   "axis": {},
   "retrieved_at": "2026-09-26",
   "quote": "Additional time is permitted for conducting repairs on appliances where the necessary repair parts are unavailable or if other applicable federal, state, or local regulations make a repair within required timeline (e.g., 30 or 120 days) impossible.",
   "source_class": "primary-government",
   "text_sha256": "297e3c99146afa26f79a3424c63a9e6464fd4b22cf8a40207bb0ff816ebf8f86"
  },
  {
   "source": "EPA stationary refrigeration leak repair requirements",
   "url": "https://www.epa.gov/section608/stationary-refrigeration-leak-repair-requirements",
   "figure": "30 days",
   "value": 30,
   "unit": "day",
   "vat": null,
   "axis": {},
   "retrieved_at": "2026-09-26",
   "quote": "Owners or operators who choose to retrofit or retire appliances must develop a retrofit or retirement plan within 30 days of detecting a leak that exceeds the trigger rates.",
   "source_class": "primary-government",
   "text_sha256": "297e3c99146afa26f79a3424c63a9e6464fd4b22cf8a40207bb0ff816ebf8f86"
  },
  {
   "source": "EPA stationary refrigeration leak repair requirements",
   "url": "https://www.epa.gov/section608/stationary-refrigeration-leak-repair-requirements",
   "figure": "30 weeks",
   "value": 30,
   "unit": "week",
   "vat": null,
   "axis": {},
   "retrieved_at": "2026-09-26",
   "quote": "EPA will permit one additional 12-month period if the appliance is custom-built and the supplier of the appliance or a critical component has quoted a delivery time of more than 30 weeks from when the order was placed (assuming the order was placed in a timely manner).",
   "source_class": "primary-government",
   "text_sha256": "297e3c99146afa26f79a3424c63a9e6464fd4b22cf8a40207bb0ff816ebf8f86"
  },
  {
   "source": "EPA stationary refrigeration leak repair requirements",
   "url": "https://www.epa.gov/section608/stationary-refrigeration-leak-repair-requirements",
   "figure": "180 days",
   "value": 180,
   "unit": "day",
   "vat": null,
   "axis": {},
   "retrieved_at": "2026-09-26",
   "quote": "Within 180 days of the failed follow-up verification test, the owners or operators determine the leak rate is below the trigger rate.",
   "source_class": "primary-government",
   "text_sha256": "297e3c99146afa26f79a3424c63a9e6464fd4b22cf8a40207bb0ff816ebf8f86"
  },
  {
   "source": "eCFR 40 CFR 82.157 appliance maintenance and leak repair",
   "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-82/subpart-F/section-82.157",
   "figure": "30 days",
   "value": 30,
   "unit": "day",
   "vat": null,
   "axis": {},
   "retrieved_at": "2026-09-26",
   "quote": "Owners or operators must identify and repair leaks in accordance with this paragraph within 30 days (or 120 days if an industrial process shutdown is required) of when refrigerant is added to an appliance exceeding the applicable leak rate in paragraph (c) of this section.",
   "source_class": "primary-government",
   "text_sha256": "8e189b07daf74e52518a08a21b92675ced5960e0137d6c3e155cafb8c7d9270e"
  },
  {
   "source": "eCFR 40 CFR 82.157 appliance maintenance and leak repair",
   "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-82/subpart-F/section-82.157",
   "figure": "12 months",
   "value": 12,
   "unit": "month",
   "vat": null,
   "axis": {},
   "retrieved_at": "2026-09-26",
   "quote": "This must be confirmed by the leak rate calculation performed upon the next refrigerant addition. The leaks will be presumed to be repaired if there is no further refrigerant addition for 12 months after the repair or if the leak inspections required under paragraph (g) do not find any leaks in the appliance.",
   "source_class": "primary-government",
   "text_sha256": "8e189b07daf74e52518a08a21b92675ced5960e0137d6c3e155cafb8c7d9270e"
  },
  {
   "source": "eCFR 40 CFR 82.157 appliance maintenance and leak repair",
   "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-82/subpart-F/section-82.157",
   "figure": "30 days",
   "value": 30,
   "unit": "day",
   "vat": null,
   "axis": {},
   "retrieved_at": "2026-09-26",
   "quote": "Unless granted additional time, an initial verification test must be performed within 30 days (or 120 days if an industrial process shutdown is required) of an appliance exceeding the applicable leak rate in paragraph (c) of this section.",
   "source_class": "primary-government",
   "text_sha256": "8e189b07daf74e52518a08a21b92675ced5960e0137d6c3e155cafb8c7d9270e"
  },
  {
   "source": "eCFR 40 CFR 82.157 appliance maintenance and leak repair",
   "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-82/subpart-F/section-82.157",
   "figure": "10 days",
   "value": 10,
   "unit": "day",
   "vat": null,
   "axis": {},
   "retrieved_at": "2026-09-26",
   "quote": "A follow-up verification test must be performed within 10 days of the successful initial verification test or 10 days of the appliance reaching normal operating characteristics and conditions (if the appliance or isolated component was evacuated for the repair(s)).",
   "source_class": "primary-government",
   "text_sha256": "8e189b07daf74e52518a08a21b92675ced5960e0137d6c3e155cafb8c7d9270e"
  },
  {
   "source": "eCFR 40 CFR 82.157 appliance maintenance and leak repair",
   "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-82/subpart-F/section-82.157",
   "figure": "30 days",
   "value": 30,
   "unit": "day",
   "vat": null,
   "axis": {},
   "retrieved_at": "2026-09-26",
   "quote": "Owners or operators are permitted more than 30 days (or 120 days if an industrial process shutdown is required) to comply with paragraphs (d) and (e) of this section if they meet the requirements of (f)(1) through (4) of this section or the appliance is mothballed.",
   "source_class": "primary-government",
   "text_sha256": "8e189b07daf74e52518a08a21b92675ced5960e0137d6c3e155cafb8c7d9270e"
  }
 ],
 "not_published": [
  {
   "source": "eCFR 29 CFR 1910.178 powered industrial trucks",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.178",
   "retrieved_at": "2026-10-17",
   "reason": "read in full and no accepted figure on the page"
  },
  {
   "source": "OSHA 1910.178 standard page",
   "url": "https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.178",
   "retrieved_at": "2026-09-12",
   "reason": "read in full and no accepted figure on the page"
  },
  {
   "source": "eCFR 29 CFR 1910.179 overhead and gantry cranes",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.179",
   "retrieved_at": "2026-10-03",
   "reason": "every candidate on the page was refused"
  },
  {
   "source": "eCFR 49 CFR 396.17 periodic inspection",
   "url": "https://www.ecfr.gov/current/title-49/subtitle-B/chapter-III/subchapter-B/part-396/section-396.17",
   "retrieved_at": "2026-10-17",
   "reason": "read in full and no accepted figure on the page"
  },
  {
   "source": "eCFR 42 CFR 482.41 hospital physical environment",
   "url": "https://www.ecfr.gov/current/title-42/chapter-IV/subchapter-G/part-482/section-482.41",
   "retrieved_at": "2026-10-17",
   "reason": "read in full and no accepted figure on the page"
  },
  {
   "source": "HSE LOLER guidance (GB)",
   "url": "https://www.hse.gov.uk/work-equipment-machinery/loler.htm",
   "retrieved_at": "2026-09-11",
   "reason": "read in full and no accepted figure on the page"
  },
  {
   "source": "PUWER 1998 regulation 6 (inspection), GB",
   "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/6",
   "retrieved_at": "2026-09-12",
   "reason": "read in full and no accepted figure on the page"
  },
  {
   "source": "HSE legionnaires disease (ACOP L8) index, GB",
   "url": "https://www.hse.gov.uk/legionnaires/index.htm",
   "retrieved_at": "2026-09-12",
   "reason": "read in full and no accepted figure on the page"
  },
  {
   "source": "NFPA 25 standard page",
   "url": "https://www.nfpa.org/codes-and-standards/nfpa-25-standard-development/25",
   "retrieved_at": "2026-10-10",
   "reason": "read in full and no accepted figure on the page"
  }
 ],
 "sources": [
  {
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.178",
   "label": "eCFR 29 CFR 1910.178 powered industrial trucks",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.178",
   "label": "OSHA 1910.178 standard page",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-82/subpart-F/section-82.157",
   "label": "eCFR 40 CFR 82.157 appliance maintenance and leak repair",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.epa.gov/section608/stationary-refrigeration-leak-repair-requirements",
   "label": "EPA stationary refrigeration leak repair requirements",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.179",
   "label": "eCFR 29 CFR 1910.179 overhead and gantry cranes",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.ecfr.gov/current/title-49/subtitle-B/chapter-III/subchapter-B/part-396/section-396.3",
   "label": "eCFR 49 CFR 396.3 inspection, repair and maintenance",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.ecfr.gov/current/title-49/subtitle-B/chapter-III/subchapter-B/part-396/section-396.17",
   "label": "eCFR 49 CFR 396.17 periodic inspection",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.ecfr.gov/current/title-42/chapter-IV/subchapter-G/part-482/section-482.41",
   "label": "eCFR 42 CFR 482.41 hospital physical environment",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.hse.gov.uk/work-equipment-machinery/loler.htm",
   "label": "HSE LOLER guidance (GB)",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/6",
   "label": "PUWER 1998 regulation 6 (inspection), GB",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.hse.gov.uk/legionnaires/index.htm",
   "label": "HSE legionnaires disease (ACOP L8) index, GB",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.nfpa.org/codes-and-standards/nfpa-25-standard-development/25",
   "label": "NFPA 25 standard page",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910",
   "label": "ecfr.gov",
   "license": "the publisher's own terms; quoted for reporting and comment"
  }
 ],
 "methodology": "Every row is a verbatim sentence read from the named source's own page through our fetch service on the date shown, hash-pinned to the stored read (the sha of the page's visible text; the raw page is mirrored to R2). 3 of the 12 named sources that could be read published a usable figure; 9 published none and are recorded as not published, never filled in; 1 could not be read (blocked, dead or unreachable) and count nowhere. The headline figures (median, minimum, maximum, quartiles) are over ONE figure per source in day (a source's median where its page yielded several accepted sentences), so N counts sources, never sentences; 26 candidate sentence(s) were refused by a reviewer with the reason recorded. The fuller derivation this dataset is chartered to grow into (not yet what the figures above are; they are each source's own published figure as read): one row per jurisdiction per asset per rule: the required frequency quoted verbatim with its citation and effective date, beside the maker's recommended interval for the same asset from the interval index - which is the comparison nobody publishes (where the law is looser than the manufacturer, and where it is stricter); changed-since, which is the news when a rule is amended",
 "embed": "<figure style=\"margin:0;padding:16px;border:1px solid #d9d9d9;border-radius:8px;background:#ffffff;color:#111111;font-family:system-ui,sans-serif;max-width:480px\"><p style=\"margin:0 0 8px;font-size:28px;font-weight:700;color:#111111;background:#ffffff\">30 to 90 day</p><p style=\"margin:0 0 8px;font-size:14px;color:#111111;background:#ffffff\">3 published figures, Compliance Inspection Calendar, across 3 sources, read 17 October 2026</p><figcaption style=\"font-size:12px;color:#444444;background:#ffffff\"><a href=\"https://upkeepvo.com/datasets/compliance-inspection-calendar/#median\" style=\"color:#1a4fd6;background:#ffffff\">Source: Upkeepvo Compliance Inspection Calendar</a></figcaption></figure>"
}
